By Decision RAEWW Ε-39/2024 (Government Gazette B ́1847/26.03.2024), the Update of the List of Ancillary and Invoiced Services of the Distribution Networks of Thessaloniki and Thessaly and their unit prices in accordance with the provisions of article 13 of the Natural Gas Distribution Network Operation Code was approved. The list of Ancillary Services and the corresponding charges apply from the publication of the Decision in the Government Gazette until December 31, 2024. The Operator shall, by 1ST October 2024, submit for approval to RAAEY a new List of Ancillary Services with their unit prices in accordance with article 13 par. 4 of the Code. Until the entry into force of the new List of Ancillary Services and its corresponding unit prices, the ones approved by Decision RAEWW Ε-39/2024 apply.
According to OGG 1847/Β’/26.03.2024:
(1) For Municipalities where natural gas penetration is less than or equal to 25%, a 100% discount is granted on Connection Fees.
(2) For Municipalities where the penetration of natural gas is greater than 25% and less than or equal to 75%, a discount on Connection Fees of 70% is granted in 2024.
(3) For municipalities where the penetration of natural gas is greater than 75%, no discount is granted.
Service (α) Connection of new Delivery Points to the Distribution Network:
DISTRIBUTION NETWORK - THESSALONIKI
DISTRIBUTION NETWORK - THESSALIA
Service (b) Installation and maintenance of smart metering systems, including support equipment:
|
THESSALONIKI |
THESSALY |
Smart meter & remote metering equipment type |
Cost |
Cost |
G4 |
85,74 € |
86,93 € |
G6 |
96,44 € |
97,63 € |
G10 |
411,44 € |
412,63 € |
G16 |
411,44 € |
412,63 € |
G25 |
506,44 € |
507,63 € |
PTZ volume corrector with telemetry system |
721,44 € |
722,63 € |
Service (c) Emergency technical inspections at the pressure metering and regulating stations of the Delivery Points, upon request of the Distribution User or the End Consumer:
Free of charge
Service (d) Installation of telemetry equipment in the existing Delivery Points, upon request of the Distribution User or the End Consumer:
Same as service (b).
Service (e) Relocation of part of the existing Distribution Network upon request of the End Consumer or the Distribution User:
Charge (ad hoc)
Service (f) Modification of the External Installation, upon request of the End Consumer:
Charge (ad hoc)
Service (g) dismantling of part or the whole of the External Installation, either upon request of the Distribution User or End Consumer, or upon termination of the Connection Contract:
Charge (ad hoc)
Service (h) Cut-off of supply or deactivation of part or whole of the External Installation, either upon request of the Distribution User or End Consumer, or upon termination of the Connection Contract:
|
THESSALONIKI |
THESSALY |
|
Shut-down Cost |
Shut-down Cost |
Meter G4 to G40 (Cut-off following a request of the Distribution User upon request of the End Consumer) |
20,17 € |
21,25 € |
Meter >G40 (Cut-off following a request of the Distribution User upon request of the End Consumer) |
26,37 € |
27,65 € |
Meter G4 to G40 (Cut-off upon request of the Distribution User) |
20,67 € |
21,75 € |
Meter >G40 (Cut-off upon request of the Distribution User) |
26,87 € |
28,15 € |
Meter G4 to G40 (Cut-off on the Initiative of the Company) |
22,30 € |
23,49 € |
Meter >G40 (Cut-off on the Initiative of the Company) |
28,50 € |
29,89 € |
Service (i) Reactivation of part of whole of the External Installation following Cut-off, upon request of the End Consumer or the Distribution User:
|
THESSALONIKI |
THESSALY |
|
Reactivation Cost |
Reactivation Cost |
Meter G4 to G40 (Meter Reactivation following Cut-off following a request of the Distribution User upon request of the End Consumer) |
21,44 € |
22,63 € |
Meter >G40 (Meter Reactivation following Cut-off following a request of the Distribution User upon request of the End Consumer) |
27,64 € |
29,04 € |
Meter G4 to G40 (Meter Reactivation following Cut-off upon request of the Distribution User) |
21,44 € |
22,63 € |
Meter >G40 (Meter Reactivation following Cut-off upon request of the Distribution User) |
27,64 € |
29,04 € |
Meter G4 to G40 (Meter Reactivation following Cut-off on the Initiative of the Company) |
21,44 € |
22,63 € |
Meter >G40 (Meter Reactivation following Cut-off on the Initiative of the Company) |
27,64 € |
29,04 € |
Service (j) Disconnection of an End Consumer by intervening on the External Installation, upon request of the Distribution User or End Customer, or at the initiative of the Operator.
|
THESSALONIKI |
THESSALY |
|
Disconnection Cost |
Disconnection Cost |
Cutting off the Riser through Simple intervention |
116,23 € |
117,99 € |
Cutting off the Riser using a Ladder |
116,23 € |
117,99 € |
Cutting off the Riser using Lifting Equipment (up to 24 meters) |
935,64 € |
938,03 € |
Cutting off the Riser using Lifting Equipment (over 24 meters)1 |
635,64 € |
638,03 € |
Cutting off the Riser using Lifting Equipment (Special Cases)1 |
695,64 € |
698,03 € |
Cutting off the Riser using a Scaffold |
217,01 € |
220,68 € |
•Cutting off the Riser’s Valve through Simple intervention •Valve sealing and meter removal •Shutting off the safety valve |
33,25 € |
35,01 € |
•Shutting off the Riser’s Valve using a Ladder •Shutting off the safety valve |
33,25 € |
35,01 € |
• Shutting off the Riser’s Valve using Lifting Equipment (Up to 24 meters) •Shutting off the safety valve |
842,96 € |
845,03 € |
•Shutting off the Riser’s Valve using Lifting Equipment (Over 24 meters) •Shutting off the safety valve |
542,96 € |
545,03 € |
• Shutting off the Riser’s Valve using Lifting Equipment (Special Cases) •Shutting off the safety valve |
602,96 € |
605,03 € |
• Shutting off the Riser’s Valve using a Scaffold •Shutting off the safety valve |
134,03 € |
137,70 € |
Excavation cutting off the Service Line |
509,87 € |
513,54 € |
•Sealing of the valve before the reducer •Sealing of the valve before the reducer and removal of the reducer |
33,60 € |
35,36 € |
Shutting off the Buried GRM Valve |
33,25 € |
35,01 € |
Service (j) Reconnection of an End Consumer with intervention in the External Installation:
|
THESSALONIKI |
THESSALY |
|
Reconnection Cost |
Reconnection Cost |
Reconnection of the Riser through Simple Intervention |
112,93 € |
114,12 € |
Reconnection of the Riser using a Ladder |
112,93 € |
114,12 € |
Reconnection of the Riser using Lifting Equipment (Up to 24 meters) |
932,34 € |
934,17 € |
Reconnection of the Riser using Lifting Equipment (Over 24 meters) |
632,34 € |
634,17 € |
Reconnection of the Riser using Lifting Equipment (Special Cases) |
692,34 € |
694,17 € |
Reconnection of the Riser using a Scaffold |
213,71 € |
216,81 € |
•Reconnection opening the Riser’s Valve through Simple Intervention •Reconnection following disconnection with valve sealing & meter removal •Reconnection opening the safety valve |
25,89 € |
27,09 € |
•Reconnection opening the Riser’s Valve using a Ladder •Reconnection opening the safety valve |
25,89 € |
27,09 € |
•Reconnection opening the Riser’s Valve using Lifting Equipment (Up to 24 meters) •Reconnection opening the safety valve |
835,60 € |
837,11 € |
•Reconnection opening the Riser’s Valve using Lifting Equipment (Over 24 meters) |
535,60 € |
537,11 € |
•Reconnection opening the safety valve |
|
|
•Reconnection opening the Riser’s Valve using Lifting Equipment (Special Cases) •Reconnection opening the safety valve |
595,60 € |
597,11 € |
•Reconnection opening the Riser’s Valve using a Scaffold •Reconnection opening the safety valve |
126,67 € |
129,77 € |
Reconnection following disconnection through Excavation and cut-off of the Service Line |
534,88 € |
537,98 € |
•Reconnection following disconnection through valve sealing before the reducer •Reconnection following disconnection through valve sealing before the reducer and reducer removal |
26,24 € |
27,44 € |
Reconnection opening the Buried GRM Valve |
25,89 € |
27,09 € |
Service (k) Inspection of existing Internal Installations following the cut-off of the supply and/or disconnection, for safety reasons:
Free of charge
Service (l) Meter Check or calibration upon request of the End Consumer or the Distribution User:
|
THESSALONIKI |
THESSALY |
Conventional Meter Type |
Cost |
Cost |
G4 |
44,44 € |
45,63 € |
G6 |
44,44 € |
45,63 € |
G10 |
81,44 € |
82,63 € |
G16 |
121,44 € |
122,63 € |
G25 |
121,44 € |
122,63 € |
G40 |
121,44 € |
122,63 € |
G65 (Diaph) |
127,64 € |
129,04 € |
G65 (T/R) |
227,64 € |
229,04 € |
G100 (T) |
237,64 € |
239,04 € |
G100 (R) |
252,64 € |
254,04 € |
G160 |
277,64 € |
279,04 € |
G250 |
327,64 € |
329,04 € |
G400 |
377,64 € |
379,04 € |
G650 |
427,64 € |
429,04 € |
G1000 |
577,64 € |
579,04 € |
G1600 |
687,00 € |
688,40 € |
G2500 |
2.056,44 € |
2.057,84 € |
|
THESSALONIKI |
THESSALY |
Smart Meter Type |
Cost |
Cost |
G4 |
241,44 € |
242,63 € |
G6 |
251,44 € |
252,63 € |
G10 |
261,44 € |
262,63 € |
G16 |
271,44 € |
272,63 € |
G25 |
341,44 € |
342,63 € |
Service (m) Recording of readings by the Operator upon request of the End Consumer or the Distribution User, with a frequency different than the one specified by the Metering Regulation:
Free of charge
Service (n) Provision of information about potential future supply regarding a connection application that has been temporarily rejected:
Free of charge
[1] This includes the transportation of the lifting machine to the site of the project, the use of the machine at any height of the building by a qualified driver, the maintenance, wear and removal of the machine after the completion of the works.